Case Studies/Portfolio

Since 1989, RBR has completed over 195 construction/development projects in the United States (Puerto Rico, Texas, and North Dakota). Please browse the few project case studies highlighted below and feel free to contact us for a full project listing.

Kickapoo Downtown Airport
Wichita Falls, Texas
Owner: Texas Department of Transportation
Total Project Cost: $1,993,141.00
Project Duration: 6 Months
Categories: Airport: Concrete Addition

RBR Infrastructure & Road, LLC will commence works at Kickapoo Downtown Airport in June 2017. Works are composed of the removal of existing PCC Pavement and the placing of 10,433 SY of reinforced PPC Pavement with a Wirtgen SP84I and placed 2,310 CY of Crushed ABC. This project is scheduled for full completion in 168 calendar days with a total contract amount of $1,993,141.00.

2016 Water Main and Sewer Replacement
Highland Park, Texas
Owner: Town of Highland Park
Total Project Cost: $806,930.00
Project Duration: 4 Months
Categories: Pipeworks: Concrete Addition

RBR was awarded another job with the Town of Highland Park for the 2016 Water Main and Sewer Main Replacement in Alleys (3500 to 3700 Block of Armstrong Avenue and Crescent Avenue) in January 2017. Works are estimated to be completed by June 2017. The Town of Highland Park awarded the job to RBR for works replacing existing sanitary sewer with 8” HDPE DR-17 sanitary sewer pipe and replace existing water main 8” with HDPE DR-11 water by using trenchless methods. Addition works preformed where to remove and replace existing concrete pavement in Alley with 8” reinforced concrete.

2225 Burbank Parking Site, Texas
Dallas, Texas
Owner: Viceroy Regal, LP
Total Project Cost: $542,065.00
Project Duration: 2 Months
Categories: Earthworks: Concrete, Asphalt

RBR performed works in December 2016 for earthworks, placed 4” flex base, installed storm sewer system along with lighting poles. Additional works undertaken where the construction of sidewalks, curbs and gutters, along with a concrete entrance and 2” asphalt surface course. All these works where done under 2 months by RBR.

2015 Water Main and Sewer Replacement
Highland Park, Texas
Owner: Town of Highland Park
Total Project Cost: $182,846.00
Project Duration: 3 Months
Categories: Pipeworks: Concrete Addition

On September 2015, RBR was in 2015 the Water Main and Sewer Main Replacement (4600 Block of Beverly Drive and Fairfax Avenue) & Sanitary Sewer Spot Repairs, Demolition and Reconstruction of 1,200 LF of 10 Ft wide concrete alley. RBR performed all engineering layout, formwork, and rebar installation.

2015 Water Main and Sewer Replacement
Highland Park, Texas
Owner: Town of Highland Park
Total Project Cost: $470,798.00
Project Duration: 6 Months
Categories: Pipeworks: Concrete Addition

August 2015, RBR was awarded the 2015 Water Main and Sewer Main Replacement (4600 Block of Edmondson Avenue and Fairfax Avenue) & Sanitary Sewer Spot Repairs. Works undertaken where the installation of 1,160 LF of 8” Dia. DR-17 Sanitary Sewer Line Repairs and 1,200 LF of 8” Diameter of HDPE waterline both by trenchless methods.

Preston Road Rehabilitation 2016, Phase I
Highland Park, Texas
Owner: Town of Highland Park, Texas
Total Project Cost: $914,967.00
Project Duration: 6 Months
Categories: Roadworks: Concrete Addition

RBR started works awarded in April 2016 and all works completed by October 2016 the removal and replacement of 4” and 6” thick concrete sidewalks and driveways, as well as the removal and replacement of reinforced road 8” thick surface traveling roadway and concrete bus pads. In addition, ADA ramps, repair inlets, traffic control and 3” PVC electrical conduits and 17” X 30 pull boxes were installed.

Repair Delta Hammerhead
Minot Airforce Base, North Dakota
Owner: Corps of Engineers
Total Project Cost: $1,543,651.00
Project Duration: 7 Months
Categories: Airport: Concrete Addition

RBR infrastructure & Road, LLC undertook works as a subcontractor in January 2016 and started works in March 2016 with concrete trails for repairs on Delta Hammerhead in Minot AFB in North Dakota under the inspection and supervision of the Corps of Engineer. The total subcontract was for $1,543,651.00 and was completed in September 2016.

QV JF 100120 subcontract works including demolition of 16,500 SY of concrete on Runway Apron Delta, removal of 16,500 SY of 8” sub-base course and milling of 6,420 SY of asphalt shoulder. In addition, RBR also placed 16,500 SY of 18” and 22” concrete slab with a Gomaco 2800 slip form machine. Joint saw cutting also took place along with installing 14,300 LF of compression joint. Some additional works RBR performed where to prepared 4,000 SY of outside shoulder for HMA pavement for the main contractor.

Alley Reconstruction 12-2037
Dallas, Texas
Owner: City of Dallas
Total Project Cost: $1,497,428.00
Project Duration: 8 Months
Categories: Roadworks: Concrete Addition

In late August 2016, RBR was awarded the reconstruction and demolition of 6, 668 SY of 10 Ft wide concrete ally 8” thick. RBR performed all engineering, layout, formwork, rebar installation, cleaning and restoration for the Alley Reconstruction 12-2037.

Mockingbird Lane and Airline Road Traffic Signal Installation
Highland Park, Texas
Owner: Town of Highland Park, Texas
Total Project Cost: $417,236.00
Project Duration: 3 Months
Categories: Roadworks: Concrete Addition

Mockingbird Lane and Airline Road Traffic Signal Installation works started demolition April 2015 on existing reinforced concrete paving and finished works on July 2015. Reconstruction and installation of new road intersection including reinforced concrete surface, traffic control, asphalt paving, sidewalks and traffic control.

SMU Blvd Beautification & Trail Connection
Dallas, Texas
Owner: City of Dallas
Total Project Cost: $2,100,030.00
Project Duration: 10 Months
Categories: Roadworks: Concrete Addition

RBR was awarded work September 2014 and works where completed by July 2015. Works undertaken where the construction of 6,000 SY of 6” concrete pavement slabs. In addition, RBR installed 22,000 SF of drop slab for vehicular pavers (8,400SF of 8 wide).

South Airfield Improvement Runway 10-28 Reconstruction
Luis Muñoz Martin International Airport, Carolina, Puerto Rico
Owner: Puerto Rico Ports Authority
Total Project Cost: $17,976,652.00
Project Duration: 32 Months

The largest undertaking commissioned by the Puerto Rico Port Authority (PRPA), RBR was chosen to complete the reconstruction of runway 10-28 of Luis Muñoz Marín International Airport. This $17,976,652.00 job included the demolition of the existing connectors and taxiways, stabilization of the foundation and replacement of base and sub-base by removing 3 feet of existing unsuitable material and replacing that with gavion stone and recycled material.

In an green-inititive/recycling effort, all demolished concrete was crushed, sorted and processed and reused as the runway base and sub-base. The project's scope of work also included all new storm sewer system under the taxiways and connectors using reinforced concrete pipelines varying in size between 18" to 60" with headwalls and manholes.

An excellent example of RBR's ability to adapt and overcome project-specific issues was our solution to the concrete supply problem. Local supply could not meet the needs of our project so the decision was made to buy our own concrete central-mix batching plant that produced 250 CYD per hour of concrete. This enabled us to complete our project ahead of schedule since we controlled the concrete supply.

RBR was awarded the award for the Most Outstanding Civil Engineering Project of the Year by the Colegio de Ingenieros y Agrimensores (College of Engineers & Surveyors) of Puerto Rico for our outstanding work on this large-scale airport rehabilitation project.

Construction of Reversible Lane and Pavement Rehabilitation
Unit I Las Americas Expressway PR-52, San Juan, Puerto Rico
Owner: Puerto Rico Highway Authority
Total Project Cost: $11,669,729.00
Project Duration: 10 Months

RBR was selected as primary contractor for the Construction of Reversible Lane and Pavement Rehabilitation, Unit 1 Las Americas Expressway PR-52, San Juan, Puerto Rico.

The project consisted of construction of the reversible lane along Las Americas Expressway and rehabilitation of existing pavement including concrete slab repairs, crack repairs, diamond grinding and re-sealing of joints. In addition RBR made adjustment to existing storm sewer structures, over-saw installation of movable barriers, traffic signs, pavement markings, and general traffic maintenance.

RBR's reputation for on-time completion was a perfect match for one of the main constraints of this project. The Puerto Rico Highway Authority required all construction of the reversible lane (a total of 24,100 square-meters) to be completed and open-to-the-public within 90 days. RBR not only achieved this requirement, but completed the work ahead of schedule and delivery a completed project in just 75 days!

Widening Las Americas Expressway
Hwy PR-18 and Reversible Lane Extension from Station: 25-80.00 to Station 40+5.62, San Juan, Puerto Rico
Owner: Puerto Rico Highway Authority
Total Project Cost: $5,253,805.00
Project Duration: 19 Months

The project commissioned by the Puerto Rico Highway Authority consisted of the widening and rehabilitation of Highway PR-18 and PR-52. The project scope included adding additional lanes, concrete slab repairs and re-sealing of existing joints.

Additional tasks completed on this projected included the extension of a reversible concrete lane and retaining wall, relocation of utilities, and installation/modifications of storm sewer systems, new lighting systems, installation of movable barriers, traffic signs and pavement marking.

RBR worked during evenings and weekends to reduce the inconvenience to regular traffic flow and complete the project ahead of schedule.

Vehicular Access to Cupey Station PR-21 and Structures Demolition
San Juan, Puerto Rico
Owner: Puerto Rico Highway Authority
Total Project Cost: $1,338,413.00
Project Duration: 14 Months

Located on Highway PR-21 in close proximity to Villa Nevarez Development in the municipality of San Juan, this project consisted of the Urban Train, Cupey Station vehicular access including earthwork, sub-base preparation, asphalt pavement, curb, sidewalk lighting system, concrete pavers, traffic signs, pavement marking and miscellaneous work. This project provided a speciality for RBR with complete removal of asbestos and leaded paint in all the structures to be demolished.

PR-10 Access Ramp
Ponce, Puerto Rico
Owner: Puerto Rico Highway Authority
Total Project Cost: $2,900,000.00
Year Constructed: 2003

RBR constructed a storm sewer system that included 1,000 linear feet of reinforced concrete box culvert. Leveraging our experience, RBR submitted an alternative to build precast section of 10' x 8' x 8' long section, completing the job ahead of schedule and resulting in a better quality build. After the installation of the four box culverts RBR then built the four access ramps.

RBR Construction
Phone:
(214) 389-2900
Fax:
(214) 389-2902
 
13140 Coit Rd, Suite 230
Dallas, Texas 75240
© 2011 RBR, All Rights Reserved